Multifunctional, concert and conference halls

What is a good conference room in terms of users? From the point of view of the maintenance service? From an investor's point of view? The answers to these and hundreds of other specialized questions are contained in Russian and international standards.

At every stage of the life cycle of work on a conference hall - from concept to operation — we check the requirements and recommendations of the Russian regulatory framework, guidelines of international standards, and accumulated experience. Let's briefly review each stage.

Concept development

The concept answers the main questions: why do we need a conference room, for what purposes, and how it will look and work. The concept contains all the key ideas and solutions of the future space.

At the stage of Concept development, we act as multimedia technology consultants.: We show specific technical solutions, their advantages and disadvantages, requirements and limitations, estimate the budget and deadlines for implementation.

If necessary, we work out planning solutions in order to minimize the number of iterations at the design project development stage.

The final result of our work is several chapters in the Concept of System design, infrastructure agreements and engineering solutions.

Designing

The design begins with the development of a design project, the release of albums of art and AI. For architects, we perform electroacoustic calculations, recommend finishing materials, select combinations of sound—absorbing panels and diffusers, and study the acoustic comfort of the room.

Based on the design project, the remaining sections are being developed: power supply, lighting, air conditioning and ventilation, fire safety, low-current networks, multimedia, etc.

As a rule, different subcontractors work on different sections. The more subcontractors there are, the higher the risk of a construction site becoming a The babel of Babel. The introduction of BIM design greatly simplifies the work, but information modeling is not yet widely used.

To minimize the inertia of the system and increase the efficiency of the design stage, we establish direct interaction with all participants in the process: architects, technical supervision, general contractor, subcontractors, sub-subcontractors.

Construction and installation work

Construction and installation work is often carried out in parallel with the design.

Our tasks at this stage are:

  • Author's supervision throughout the entire stage.

  • Modification of project documentation based on the results of operational meetings, adjustments to the design project, and finding collisions with related systems.

  • Equipment supply, installation work, taking into account the general construction schedule.

  • Work with technical supervision — projects for the production of works, calculations, work acceptance regulations, expansion of the vendor list, certificates and declarations.

Commissioning

The closer the conference hall is to launch, the less time is left for commissioning: new ideas appear, unplanned work, black swans, and the deadline for the completion of the facility does not shift.

Commissioning is carried out in parallel with the completion of construction works and immediately for all engineering systems: multimedia, air conditioning and ventilation, fire safety, lighting, etc.

In modern conference rooms, all engineering systems are automated with scenario control by multimedia. Our automation and management task is to orchestrate the work of contractors and bring the conference hall to an operational state.

Exploitation

The work does not end with the launch of the conference room. Real-life exploitation shows weaknesses and blind spots.

Together with the maintenance service, we polish the scenarios and the management system. Together with contractors for related engineering systems, we are retrofitting lighting, microclimate, multimedia, and security equipment.