Museums and exhibition spaces

Multimedia installations, exhibition lighting, centralized management

How we strengthen and accelerate the work on the museum launch

  • At the stage of concept development We are working on options for the technical implementation of artistic ideas, evaluating operational parameters, and forming technical specifications for installations.

  • At the design stage we synchronize the work of contractors from the museum, build work with the general designer, technical supervision, contractors for related engineering systems.

  • At the implementation stage we integrate into the schedule of general construction work, interact with technical supervision, soften corners and sharp points.

  • At the stage of commissioning We connect all disparate systems into a single management network, and resolve conflicts on the line of responsibility between installers and creative workshops.

  • At the operational stage We polish user interfaces and instructions, and train museum staff.

We don't interfere with the creative process, we don't interfere with the flight of thought.

Stage 1. Concept development

Working out the meanings and forms is the most time—consuming stage, which has no finale.

At each subsequent stage, the facts that hinder the implementation of the plan are revealed: deadlines, money, the laws of physics. To overcome these obstacles, the creative team is constantly generating solutions until the museum opens.

Our main task as a multimedia technical contractor at the first stage is to develop technical implementation options for concepts as quickly and thoroughly as possible: find suppliers, find contractors, estimate deadlines and costs, and predict potential risks.

Stages 2 and 3. Design and implementation

Design and implementation often run in parallel. At the same time, the design itself is carried out in parallel by several subcontractors at different levels.

Our task at this stage is to satisfy the demands of different parties.:

  • To the General Designer We need summary data on energy consumption, heat generation, loads, classes of rooms, and technical specifications for related sections.

  • To the General Contractor installation schedules, requirements for construction equipment, conditions and restrictions for specific work are needed.

  • Technical supervision We need common standards for documentation, common approval processes, calculations, work projects, certificates and declarations.

  • Subcontractors We need initial data, detailed technical specifications, and guarantees that nothing will change in the future.

  • To the curator and the creative team We need weekly reports, risk forecasts, and detailed and timely information on emerging obstacles.

  • Creative workshops and installers We need clear documentation requirements, detailed technical specifications, and transparent approval schemes for technical solutions.

All this is preferably yesterday.

Stage 4. Commissioning

At each subsequent iteration of the general construction schedule, the commissioning stage becomes narrower and smaller: unplanned stages appear during construction, and the deadline for the completion of the facility does not change.

Our task is at the stage of commissioning:

  • Ensure uninterrupted operation all museum subcontractors in the face of endless obstacles: on-the-fly project adjustments, temporary power supply scheme, dusty work, shifts in the deadlines of related parties, on-site inspections, delays at customs, Internet outages and air alarms…

  • Timely release of documentation for technical supervision during the course of work.

  • Automation of the museum system. bringing all installations of all contractors into a single network.

  • Conducting a technical opening in conditions of partial readiness.

Stage 5. Operation

The work on multimedia in the museum does not end after the launch. The real-life experience of visitors and guides shows undeveloped places and blind spots. Installations, scenarios, lighting, and control systems are sanded, polished, and faceted over the course of a month, three, or six months.

Our task at the final stage is to put the squeeze on the victorious end, when everyone is already tired, and someone gave up and gave up.